Click to view HOME PAGE
PROJECT BIDDING DETAIL
...........................................
If you have NEVER BID with Westland Construction, and would like to participate in bidding on any of the projects listed in the bid room, we require that you register as a supplier/sub-contractor to join our bid list. If you are not registered please take a moment to register online.
This page was last updated: December 30, 2011
PROJECT DETAILS:
Project Name:
Scofield Building Addition, Helper UT
Bid Date & Time:
Bids due location:
Notes:
Specifications:
NOTICE ! All plans, specifications, and information provided on our online bid room are scanned, pdf documents. Westland Construction does not guarantee the scale, accuracy or information provided via these documents.  We cannot guarantee all pages are included and waive all responsibility and liability for any information provided on these pages. 
ALL SUBCONTACTORS ARE EXPECTED TO REVIEW THE SITE CONDITIONS, HARD COPIES OF THE PLANS ISSUED BY THE ARCHITECT/ENGINEERS AND ADHERE TO THE PLANS, SPECIFICATIONS, and/or ADDENDUMS LISTED ON THIS ONLINE PLAN ROOM.
Plans
Addenda:
We would like to have all subcontractors fill out and fax in our Pre-qualification form
Click to view Pre-qualification
Estimator:
Architect:
Copyright © 2009 Westland Construction, Inc. All rights reserved.
Do it the WESTLAND way
Our Services
Our Projects
Are you what we are looking for ?
Contact Us
Drawings
........................................................................................................................................................
Specifications

September 27, 2011 @ 2:00 PM
WPA Architecture
Demolition of existing chapel, classrooms, branch president’s office, corridors, restrooms, materials center & serving area. Selective demolition of structural roofing components in existing cultural hall to remain. Construction of a new chapel connected to the existing Cultural Hall, Primary & Relief Society Rooms, Branch President & Clerks Offices, Material Center & Serving Area, Restrooms, and associated mechanical rooms & corridors. Wood framed construction over crawl space with a metal roof over pre-manufactured roof trusses. Exterior brick wainscot and finish with Mineral Fiber Cement siding. Aluminum framed storefront and windows.

250 Calendar day completion time


Tax exempt



Fax your bids to 801.374.6060
Fax to Orem Utah Office: 801-374-6060      Email:john@gowestland.com
John Clayton
Site photos
Addendum 1
Addendum 2
Soils Report